Sunday, February 28, 2021
- Advertisement -
Home Network Rail Elevated Troughing Product Acceptance

Elevated Troughing Product Acceptance

RIVVAL is delighted to announce the receipt of Network Rail full product acceptance for its elevated troughing system.

Following extensive site trials on the Felixstowe Branch Line Capacity Enhancement, where approximately three miles of the elevated troughing was installed, and comprehensive testing the product has now received its Certificate of Acceptance PA05/06747.

The RIVVAL elevated troughing system is an efficient and effective cable management system utilising glass reinforced plastic (GRP) in 6m lengths to protect and contain cables along the trackside.

The elevated troughing system is extremely light whilst maintaining a high level of stability over its six-metre suspended length. It is easy to install and offers reliable protection for cables against influences from the outside.

The rugged system allows for use in topographically difficult terrains such as uneven ground surface, slopes and inclines, bends, viaducts and bridges. This provides maximum flexibility when it comes to cable protection and ease of installation.

Three different variants are available providing a range suitable for applications with varying cable capacities.

The RIVVAL elevated troughing system provides the following advantages: –

• One-piece supporting structure and cable duct;
• Quick-action fasteners for the lid
• Standard span of 6m;
• Reduced transport costs compared to other trackside cable management products;
• Lower storage costs than other trackside cable management products;
• Solid design, made of glass fibre reinforced plastic material (GRP);
• Non-conductive;
• High mechanical stability;
• Permanent dimensional stability between -30 °C and +85 °C

Click here to view the range.

Photo credit: RIVVAL


For today’s rail news from railbusinessdaily.com click here.

- Advertisement -

Most Popular

Dyer & Butler Invests in Miniature Vacuum Excavators to Enhance Excavation Safety Procedures

Investing in innovation and the continued enhancement of its excavation safety procedures, Dyer & Butler, a part of the M Group Services Transport Division,...

Rail trade bodies come together on key ‘asks’, to make Rail Project SPEED a success

The three main rail supply trade bodies have come together to set out five key ‘asks’ to help ensure Rail Project SPEED – the...

Dover Priory footbridge and canopy upgrade thanks to £3.5m investment from Network Rail

Refurbishment and repair work at Dover Priory station will increase the life of the footbridge, as well as providing upgraded platform canopies to keep...

Network Rail gives ‘Heart of Wessex’ line some love over five-day closure

Passengers travelling on the line between Bristol and Weymouth can look forward to a more reliable railway following vital maintenance between Dorchester West and...