Wednesday, December 7, 2022
- Advertisement -
Home Network Rail Vital upgrades for West Highland Line

Vital upgrades for West Highland Line

Network Rail engineers will be delivering upgrade and refurbishment works on the West Highland Line this October.

The line will be closed between Crianlarich and Fort William from Saturday, October 5, until start of service on Monday, October 14, to allow the vital engineering works to take place.

During the week-long line closure, engineers will be working around-the-clock to refurbish bridges and renew under-track drainage systems on the line.

Advertisement

Bridges near Spean Bridge and Corrour will be refurbished and repainted, while the Auch (Horseshoe) Viaduct near Bridge of Orchy will have its timber deck renewed and its metalwork repaired and repainted.

Drainage culverts beneath the track between Tyndrum Upper and Bridge of Orchy will also be upgraded.

Due to the complexity and volume of the engineering work and the heavy machinery involved, these upgrades cannot be delivered without the short-term closure of the line.

Buses will replace trains between Crianlarich and Fort William during this time and will call at the majority of stations along the route, apart from Corrour and Rannoch where no suitable road access is available.

Lindsay Saddler, head of maintenance for Network Rail Scotland, said: “We need to carry out vital works at several points on the West Highland Line during this time.

“One of these jobs will be refurbishing the Auch Viaduct which involves lifting the track so we can replace the wooden deck underneath. The metalwork on the structure will also be repaired and repainted.

“Elsewhere, we’ll be renewing and rebuilding drainage culverts under the line, which given the recent weather, is an important task.

“These are significant and complex pieces of work and it is simply not possible to complete them without closing the line for a short time.

“We understand the inconvenience engineering works can cause to some customers and always try to deliver significant projects like these outwith the peak tourist seasons. We do though apologise to anyone whose plans are impacted by this closure.”

image_pdfDownload article

Most Popular

Huge warehouse fire causing rail delays

Firefighters have been dealing with a major warehouse fire next to railway lines in Wolverhampton. For safety Network Rail was forced to close the tracks...

The Railway Children Sleepout is back for 2023

The Railway Children Sleepout is back for 2023 after a record-breaking night raised over £180,000 last time. This incredible event draws people from across...

RMT announce new rail strikes over Christmas

Transport Secretary Mark Harper has accused the RMT of failing to play its part after the union has instructed its members to reject a...

Completion of the first tranche of Southern fleet modernisation

Govia Thameslink Railway (GTR) has completed a comprehensive modernisation programme for Southern Railway's 75 “Class 377/4” trains. New features include passenger priorities such as...
- Advertisement -